    Survey control for Electric Train Phase 3

    A contracted scope covering installation, observation and handover of 27 control points for Phase 3 between El Salam and the New Administrative Capital.

    Location
    El Salam–New Administrative Capital
    Services
    1

    Key metrics

    27
    points in the contracted scope

    GeoGiza’s workstream concerned the survey-control network for Phase 3. The contract specified monument installation, observation and handover.

    The figure of 27 describes the contracted scope. For a comparable network, specify the point distribution, horizontal and vertical references, observation records, coordinate deliverables and acceptance requirements.