
We perform infrastructure surveying for roads, bridges, water/sewer and power networks: longitudinal and cross sections, centreline setting-out, as-built capture of existing networks, and earthwork-volume calculation. Deliverables integrate with design and project management for reconstruction and large-expansion projects.
An infrastructure project without accurate baseline data runs on estimates: channel levels differing from design, existing networks clashing with excavation, and quantities multiplying in statements. Infrastructure surveying fixes the centrelines, levels, and existing utilities before the excavator moves.
Road and utility contractors, infrastructure authorities and consultants, and reconstruction and expansion project teams that need a documented as-is survey and precise centreline setting-out.
Establish control points tied to the required reference system
Survey longitudinal/cross sections and existing utilities
On-site setting-out of centrelines and levels during construction
Compute cut-and-fill volumes and deliver DWG and CSV files
From our owned 90+ instrument fleet, we deploy the following on this service:

Survey instruments for precise angle and distance measurement — control networks, layout, and as-builts.

Survey-grade GPS receivers for centimeter-accurate satellite positioning (RTK) — control, topographic, and cadastral work.

Automatic and digital levels for high-precision elevation and benchmark networks.
We own and operate our field fleet — our site shots carry the “From our field work” chip, alongside class-reference photos.
Yes, we mobilise regional crews for infrastructure and reconstruction projects with full documentation of control points and measurements.
It depends on scope: centreline length and number of sections required, the density of existing utilities to capture, and the reference-system and certification requirements. Long projects are priced per kilometre at a preferential rate. Tell us the project route and scope and we will send a detailed quote.
Yes — field setting-out is available as an execution stage after the survey: we fix centrelines and levels with clear, protected markers, and run periodic verification visits to confirm accuracy as work progresses.
We split the route into sections surveyed and delivered in successive batches, so design or construction starts on the early sections while the rest are still being captured — with unified control points along the whole corridor guaranteeing consistent levels and coordinates from end to end.
Yes — we mobilise regional crews for infrastructure and reconstruction projects outside Egypt, adhering to the project country’s approved local reference system, with full documentation of control points and measurements to the owner’s required standards.
Real photographs from GeoGiza's field projects across Egypt and the region.
We take the risk off your project — so you can commit with confidence.
If a deliverable misses the agreed accuracy spec, we re-survey and correct it at no extra cost.
We agree the delivery schedule up front and keep you updated at every stage until it's met.
Every engagement is covered by an NDA. Your data and drawings are never shared.
You receive the editable source files (DWG, DXF and more) — full ownership, no lock-in.