    Infrastructure Survey
    Surveying · Land Surveying

    Infrastructure Survey

    We perform infrastructure surveying for roads, bridges, water/sewer and power networks: longitudinal and cross sections, centreline setting-out, as-built capture of existing networks, and earthwork-volume calculation. Deliverables integrate with design and project management for reconstruction and large-expansion projects.

    Turnaround
    5–15 working days depending on length
    Deliverables
    4

    By the numbers

    5–15 days
    Per project length
    ±2 cm
    Setting-out accuracy
    L & X sections
    Documented sections

    The problem we solve

    An infrastructure project without accurate baseline data runs on estimates: channel levels differing from design, existing networks clashing with excavation, and quantities multiplying in statements. Infrastructure surveying fixes the centrelines, levels, and existing utilities before the excavator moves.

    Who needs this service

    Road and utility contractors, infrastructure authorities and consultants, and reconstruction and expansion project teams that need a documented as-is survey and precise centreline setting-out.

    When you need this service

    • When designing or constructing a road or bridge
    • When surveying existing utility networks before expansion
    • On reconstruction projects that need accurate baseline data

    How we execute

    1. 1

      Establish control points tied to the required reference system

    2. 2

      Survey longitudinal/cross sections and existing utilities

    3. 3

      On-site setting-out of centrelines and levels during construction

    4. 4

      Compute cut-and-fill volumes and deliver DWG and CSV files

    What we need from you

    • Project extent and scope of work
    • Available control points, if any
    • Required coordinate reference system

    What you receive

    • Longitudinal and cross sections
    • As-built of existing networks and utilities
    • Cut-and-fill earthwork volumes
    • DWG files and a CSV point file

    Equipment & methodology

    We equip this service from our owned fleet of 90 instruments:

    Leica total station instrument

    Total stations

    Survey instruments for precise angle and distance measurement — control networks, layout, and as-builts.

    Trimble GNSS RTK receiver

    GPS / GNSS / RTK receivers

    Survey-grade GPS receivers for centimeter-accurate satellite positioning (RTK) — control, topographic, and cadastral work.

    Automatic surveying level

    Levels

    Automatic and digital levels for high-precision elevation and benchmark networks.

    We own and operate our field fleet — our site shots carry the “From our field work” chip, alongside class-reference photos.

    Frequently asked

    Do you work on reconstruction sites?+

    Yes, we mobilise regional crews for infrastructure and reconstruction projects with full documentation of control points and measurements.

    How much does an infrastructure survey cost?+

    It depends on scope: centreline length and number of sections required, the density of existing utilities to capture, and the reference-system and certification requirements. Long projects are priced per kilometre at a preferential rate. Tell us the project route and scope and we will send a detailed quote.

    Do you set out centrelines and levels during construction?+

    Yes — field setting-out is available as an execution stage after the survey: we fix centrelines and levels with clear, protected markers, and run periodic verification visits to confirm accuracy as work progresses.

    How are multi-kilometre projects managed?+

    We split the route into sections surveyed and delivered in successive batches, so design or construction starts on the early sections while the rest are still being captured — with unified control points along the whole corridor guaranteeing consistent levels and coordinates from end to end.

    Do you work outside Egypt on regional projects?+

    Yes — we mobilise regional crews for infrastructure and reconstruction projects outside Egypt, adhering to the project country’s approved local reference system, with full documentation of control points and measurements to the owner’s required standards.

    From the field

    Our crews on real projects

    Real photographs from GeoGiza's field projects across Egypt and the region.

    Our guarantees to you

    We take the risk off your project — so you can commit with confidence.

    Accuracy guarantee

    If a deliverable misses the agreed accuracy spec, we re-survey and correct it at no extra cost.

    On-time commitment

    We agree the delivery schedule up front and keep you updated at every stage until it's met.

    Full confidentiality

    Every engagement is covered by an NDA. Your data and drawings are never shared.

    You own the files

    You receive the editable source files (DWG, DXF and more) — full ownership, no lock-in.