The work covered the topographic survey package and Civil 3D processing. The survey-control datasets covered Transverse Road 4, Sadr Hitan and Bir El Abd.
The 60 km measurement refers to the section covered by the survey package. For a comparable enquiry, provide the start and end chainage, corridor width, horizontal and vertical references, and required model and drawing formats.
